Phase 1 utility
Phase 1 utility
Type of Project : Industrial Facilities and Utility
Project Site : Boushehr Province, Khark Island
Client (Owner) : Petro Pars Company
The Project of Additional facilities of Phase One Refinery is located in South Pars, Asalouyeh. The working scope of this project includes engineering, buying, construction works, installation and commissioning of four electricity generation units each with the capacity of 80 cubic meters per hour, two water production units each with the capacity of 45 cubic meters per hour, three drinking water production units each with the capacity of 80 cubic meters per hour, one service water production unit with the capacity of 25 cubic meters per hour, three service air production units and instrumentation each with the capacity of 3246 cubic meters per hour, three service air production units and instrumentation (electrical) each with the normal capacity of 3246 cubic meters per hour and two gas oil unit with the normal capacity of 1853 cubic meters per hour, three sea water pump units (electrical) with the capacity of 2300 cubic meters per hour and two gas oil units with the capacity of 1000 cubic meters per hour.
Attributes
Power Generation Capacity (MW)
314
Steam Capacity (T / H)
240
Run Status
complete
Number of Electrical Units
4
Duration of Contract
27 month
Contract Type
EPC
Number of Steam Units
3
Other Units
9